Jun 04, 2024
618
🎯 If Cost Centres is unavailable in Process (Step 3 of the Pay Run), refer to either;
1. Change your Plan Level from Essential to Advanced.
2. Assign Payee/s to a Cost Centre.
When composing the Payees Pay, select Cost Centres.
The Cost Centres Alert (Modal) will be displayed. Adjust the QTY for each Cost Centre as required, then select Ok.